{"id":2557,"date":"2020-10-16T08:12:34","date_gmt":"2020-10-16T08:12:34","guid":{"rendered":"https:\/\/audaxrenovables.es\/audax-suministrara-electricidad-verde-al-consorci-hospital-clinic-de-barcelona\/"},"modified":"2023-06-20T11:50:27","modified_gmt":"2023-06-20T11:50:27","slug":"audax-suministrara-electricidad-verde-al-consorci-hospital-clinic-de-barcelona","status":"publish","type":"post","link":"https:\/\/www.audaxrenovables.es\/en\/audax-will-supply-green-electricity-to-the-barcelona-hospital-clinic-consortium\/","title":{"rendered":"Audax Renovables will supply more than 5,000,000 KWh of green 100% electricity to 23 companies of the Barcelona Hospital Cl\u00ednic Consorci"},"content":{"rendered":"<p><img decoding=\"async\" class=\"adx_img_post\" src=\"https:\/\/www.audaxrenovables.es\/uploads\/2020\/10\/16\/3884c796b91739cb9d9e0fe5996eb3ea.jpg\"><\/p>\n<h1 class=\"adx_tit_post\">Audax Renovables will supply more than 5,000,000 KWh of green 100% electricity to 23 companies of the Barcelona Hospital Cl\u00ednic Consorci<\/h1>\n<blockquote><p>The listed Audax Renovables, one of the main operators in the national energy sector, has won the public tender called by the Consorci Hospital Cl\u00ednic of Barcelona to supply electricity to 76 low-voltage supplies.&nbsp;<\/p><\/blockquote>\n<p>Audax Renovables has been the energy company that has presented the best offer for these supply points within the auction process that has been carried out and has been awarded a total of 10,800,000 KWh of electricity to be supplied in one year. Among the awarded centers, the Hospital Cl\u00ednic, Parc Sanitari Pere Virgili, Hospital de la Santa Creu i Sant Pau, Consorci Sanitari Integral, Fundaci\u00f3 Clinic per a la Recerca Biom\u00e8dica, Consorci d&#039;Atenci\u00f3 Prim\u00e0ria de Salut and so on up to 23 companies stand out.&nbsp;<br \/>\n&nbsp;<br \/>\nAudax Renovables has committed to certify a total of 5,400,000 KWh as 100% renewable green energy.&nbsp;<\/p>\n<p>The process, which involved both electricity and natural gas, has had a high turnout in which 8 energy companies have participated, but finally the contracts have been awarded to Audax Renovables, Endesa, Natural Gas and Uni\u00f3n Fenosa Gas.<\/p>\n<p>Audax Renovables, a group that focuses its activity on the generation and marketing of renewable 100% energy, has long positioned itself as one of the most active energy operators in Spain. In addition to the large volume of electricity sold to large private sector consumers, recently awarded public contracts are added.<br \/>\n&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Audax Renovables suministrar\u00e1 m\u00e1s de 5.000.000 de KWh de electricidad 100% verde a 23 sociedades del Consorci Hospital Cl\u00ednic de Barcelona La cotizada Audax Renovables, uno de los principales operadores del sector energ\u00e9tico nacional, ha ganado el concurso p\u00fablico convocado por el Consorci Hospital Cl\u00ednic de Barcelona para suministrar electricidad a 76 suministros alimentados en [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2556,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2557","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Audax Renovables suministrar? m?s de 5.000.000 de KWh de electricidad 100% verde a 23 sociedades del Consorci Hospital Cl?nic de Barcelona<\/title>\n<meta name=\"description\" content=\"Audax suministrar? electricidad verde al Consorci Hospital Cl?nic de Barcelona\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.audaxrenovables.es\/en\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Audax Renovables suministrar? m?s de 5.000.000 de KWh de electricidad 100% verde a 23 sociedades del Consorci Hospital Cl?nic de Barcelona\" \/>\n<meta property=\"og:description\" content=\"Audax suministrar? electricidad verde al Consorci Hospital Cl?nic de Barcelona\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.audaxrenovables.es\/en\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/\" \/>\n<meta property=\"og:site_name\" content=\"Audax Renovables\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-16T08:12:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-20T11:50:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/06\/16102020.jpg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"713\" \/>\n\t<meta property=\"og:image:height\" content=\"403\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"adminadx\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminadx\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Audax Renewables supply? more than 5,000,000 KWh of green 100% electricity to 23 companies of the Barcelona Hospital Cl?nic Consortium","description":"Audax supply? green electricity to the Consorci Hospital Cl?nic of Barcelona","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.audaxrenovables.es\/en\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/","og_locale":"en_GB","og_type":"article","og_title":"Audax Renovables suministrar? m?s de 5.000.000 de KWh de electricidad 100% verde a 23 sociedades del Consorci Hospital Cl?nic de Barcelona","og_description":"Audax suministrar? electricidad verde al Consorci Hospital Cl?nic de Barcelona","og_url":"https:\/\/www.audaxrenovables.es\/en\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/","og_site_name":"Audax Renovables","article_published_time":"2020-10-16T08:12:34+00:00","article_modified_time":"2023-06-20T11:50:27+00:00","og_image":[{"width":713,"height":403,"url":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/06\/16102020.jpg.jpg","type":"image\/jpeg"}],"author":"adminadx","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adminadx","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#article","isPartOf":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/"},"author":{"name":"adminadx","@id":"https:\/\/www.audaxrenovables.es\/ca\/#\/schema\/person\/39323131dc9a121279e4e63ed89ffbea"},"headline":"Audax Renovables suministrar\u00e1 m\u00e1s de 5.000.000 de KWh de electricidad 100% verde a 23 sociedades del Consorci Hospital Cl\u00ednic de Barcelona","datePublished":"2020-10-16T08:12:34+00:00","dateModified":"2023-06-20T11:50:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/"},"wordCount":289,"publisher":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/#organization"},"image":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#primaryimage"},"thumbnailUrl":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/06\/16102020.jpg.jpg","articleSection":["Sin categor\u00eda"],"inLanguage":"en-GB"},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/","url":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/","name":"Audax Renewables supply? more than 5,000,000 KWh of green 100% electricity to 23 companies of the Barcelona Hospital Cl?nic Consortium","isPartOf":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#primaryimage"},"image":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#primaryimage"},"thumbnailUrl":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/06\/16102020.jpg.jpg","datePublished":"2020-10-16T08:12:34+00:00","dateModified":"2023-06-20T11:50:27+00:00","description":"Audax supply? green electricity to the Consorci Hospital Cl?nic of Barcelona","breadcrumb":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#primaryimage","url":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/06\/16102020.jpg.jpg","contentUrl":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/06\/16102020.jpg.jpg","width":713,"height":403},{"@type":"BreadcrumbList","@id":"https:\/\/www.audaxrenovables.es\/ca\/audax-subministrara-electricitat-verda-al-consorci-hospital-clinic-de-barcelona\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.audaxrenovables.es\/es\/"},{"@type":"ListItem","position":2,"name":"Audax Renovables suministrar\u00e1 m\u00e1s de 5.000.000 de KWh de electricidad 100% verde a 23 sociedades del Consorci Hospital Cl\u00ednic de Barcelona"}]},{"@type":"WebSite","@id":"https:\/\/www.audaxrenovables.es\/ca\/#website","url":"https:\/\/www.audaxrenovables.es\/ca\/","name":"Audax Renewables","description":"Independent company dedicated to the production of electrical energy from renewable energy sources 100%","publisher":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.audaxrenovables.es\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.audaxrenovables.es\/ca\/#organization","name":"Audax Renewables","alternateName":"Audax Energ\u00eda","url":"https:\/\/www.audaxrenovables.es\/ca\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.audaxrenovables.es\/ca\/#\/schema\/logo\/image\/","url":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/04\/logo.png","contentUrl":"https:\/\/www.audaxrenovables.es\/wp-content\/uploads\/2023\/04\/logo.png","width":197,"height":125,"caption":"Audax Renovables"},"image":{"@id":"https:\/\/www.audaxrenovables.es\/ca\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/audaxrenovables\/","https:\/\/x.com\/AudaxRenovables","https:\/\/www.youtube.com\/user\/AudaxEnergia","https:\/\/www.tiktok.com\/@audaxrenovables","https:\/\/www.linkedin.com\/company\/203502\/admin\/"]},{"@type":"Person","@id":"https:\/\/www.audaxrenovables.es\/ca\/#\/schema\/person\/39323131dc9a121279e4e63ed89ffbea","name":"adminadx","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.audaxrenovables.es\/ca\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/60b4d621160a422b02f2d19db7066f73c964c792ce03f3da9d36f40a41bdd2e6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/60b4d621160a422b02f2d19db7066f73c964c792ce03f3da9d36f40a41bdd2e6?s=96&d=mm&r=g","caption":"adminadx"},"sameAs":["https:\/\/audaxrenovables.es"]}]}},"_links":{"self":[{"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/posts\/2557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/comments?post=2557"}],"version-history":[{"count":1,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/posts\/2557\/revisions"}],"predecessor-version":[{"id":2827,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/posts\/2557\/revisions\/2827"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/media\/2556"}],"wp:attachment":[{"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/media?parent=2557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/categories?post=2557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxrenovables.es\/en\/wp-json\/wp\/v2\/tags?post=2557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}